Top 5 ways contractors can leverage modern processes and tools to save construction costsA Story by ifieldsmartiFieldSmart Technology is working on next generation construction management solutions for enhanced productivity, proactive risk management & realistic data availability at fingertips!
Complex and fast-paced construction projects are challenging for contractors
if they are still latched onto traditional processes and tools. With schedule
overruns, budget overshoots, and paper-thin profit margins, contractors
need advanced construction processes and tools. Reinforcing contracting
services with new technologies can help contractors cut building costs, stay
productive and achieve a sound net profit.
Contractors taking on various responsibilities including overseeing fabrication
and installation face unavoidable challenges. Negligence in identifying
ambiguities in the preconstruction stage leads to devastating construction
failures. Inability to identify clashes, inefficient schedule workflows,
inaccurate cost estimates, etc. can lead to rework, project delays, cost
overshoots, material waste, and more. The following blog focuses on new and advanced processes and tools for
contractors or contracting companies to leverage costs-savings. 1. Enhance project planning through BIM reinforced with advanced
construction management tools. BIM has been the spearhead of modern construction for thousands of
contractors on a global level. The existence of various dimensions
reinforced by tangible software-driven technology helps contractors
visualize project execution in three-dimensional geometry. Adopting
BIM in the early design stages has helped contractors ease down on
construction challenges through proactive clash detection, accurate
scheduling, and sequencing, precise cost estimates, diminished
material waste, etc. The use of end-to-end construction management tools from
iFieldSmart Technologies has assisted contractors with digital, yet
holistic visualization of the entire project. Capabilities like construction
coordination, storage for MEP drawings, proactive task management,
RFI and submittal management, design automation, analytics, and
other features drive project collaboration for smart BIM. Referencing
BIM models create fewer errors, diminishes delays, and lower
construction confusion. For more information: +17034688575 Visit us: -www.ifieldsmart.com