Projects of DP Group of CompaniesA Story by glknatalieDP Consulting Group Singapore PTE LTD, DP Consultants, DP Group of Companies, ProjectsAdventure
Cove Waterpark
Category: Recreational & Civic Country: Singapore Year of Completion: 2012 Client: Resorts World Sentosa Pte Ltd
Resort World
Sentosa’s (RWS) Adventure Cove Waterpark is an aquatic adventure park
consisting of six water slides, a wave pool, kids play zone, interactive splash
pool and a 820 metre long winding thematic lazy river, that is assimilated with
the Marine Life Park and Dolphin Pool attractions
that are open to sky.
As
Singapore’s first integrated resort that possesses series of extreme rides and
attractions, the water theme park rides played a vital role in contribution to
the refinement of today’s authority codes, standards definition,
submission-approval and licensing processes for future developments. DP
Consultant’s (DPC) had to ensure that construction took place within suitable
standards of safety and quality both from the point of view of resources and
time as well as the contract parameters prescribed by RWS.
With that, DP
Consultants had to address and overcome challenges of strict micro targets and
close tracking and coordination control of multiple construction and system
processes timelines; coupled with the project, resources and contracts
dynamics, challenging site utilization permissibility with limited ingress and
egress points for access, restrictive manoeuvring within the laterally dense
building-up of specialty works and attractions, all within close proximity of
the partially opened and operating attractions and hospitality buildings
already receiving guest..
Whilst the
coordination and planning of construction activities are the fundamental
requirements of the contractor, DPC needed a thorough understanding of the construction
processes to identify and prevent potential risks that may compromise the
client’s objectives. DPC undertook advanced planning of engagements with
agencies to manage the potential risks that could arise under various project
circumstances and completion states, so that the series of TOP approval
milestones were not derailed.
DPC adopted
diverse and innovative techniques to propel the project forward within an
accelerated timeline. Critical Path Analysis, continuous Risk Assessment Checks
and Mitigations, and various forms of Program Evaluation & Review
Techniques were employed throughout various stages of the project to ascertain
that all required works were completed effectively and
efficiently within time and the structured contractual context.
Additionally,
DPC adopted a holistic approach to Project Management that not only involved
the standard PM tools, systems and processes, but also the use of psychological
and motivational tools including the generation of eye catching posters with
memorable slogans to steer and align the entire Project Team towards common
goals
Marine
Life Park & SEA Aquarium
Category: Recreational & Civic Country: Singapore Year of Completion: 2012 Client: Resorts World Sentosa Pte Ltd Size: 9,400sqm
Resorts World
Sentosa’s (RWS) Marine Life Park and SEA Aquarium houses one of the Worlds
largest aquariums and 49 smaller habitats that feature more than 100,000 marine
animals from over 800 species. The major marine life attractions and exhibits
involved intense design, procurement strategy planning within Client’s requirements,
specialist technical coordination, site management, on and off-site logistics
planning, progress supervision and construction support to supplement the main
contractor.
The
achievements in construction, testing, commissioning and
operational readiness of these aquatic tanks, marine life pool attractions and
its filtration system (processing an approximately 43 million cubic litre of
water) proved to be challenging for the remaining West Zone components as works
continued within a partially operating integrated resort.
It was a
complicated and intricate fusion of many specialist subcontractor works that
had to be managed correctly as they had marginal or absolute zero tolerances
for errors due to restrictive timelines. Specialist works included (but not
limited to):
* Extensive
tanking and PTFE canopy structures * Large
logistic movement programming for deliveries * On-site
annealing & installation of acrylic panels * Stack
building up of large life support infrastructures, equipment & system assemblies
(LSS) in tight spaces * In-tank
Creative thematic artificial environmental rockscape and coral works * Filtration
system testing * Preparation
of tanks to introduce the aquatic species.
Resorts World Sentosa
Category: Master Plan & Urban
Design, Mixed-used Development, Recreational & Civic Country: Singapore Year of Completion: 2012 Client: Resorts World at Sentosa Pte
Ltd Size: 49ha (Overall Resorts World
Sentosa)
Designed by
one of the World’s 9th largest Architectural firms, DP Architects Pte Ltd in
collaboration with Michael Graves & Associates (MGA), Resorts World Sentosa
(RWS) is Asia’s ultimate destination resort, located on Sentosa Island.
Spanning
across 49 hectares, it is home to two mega attractions. Southeast Asia’s
first-and-only Universal Studios theme park, and the Marine Life Park which
comprises the SEA Aquarium (one of the world’s largest aquariums) and the
Adventure Cove Waterpark. Other attractions include a Maritime Experiential
Museum, an award-winning luxury spa, Singapore’s first casino, seven unique
hotels, the Resorts World Convention Centre, celebrity chef restaurants and
specialty retail outlets.
DP
Consultants (DPC) spearheaded the Consultant Team and its Senior Project
Managers led more than 500 personnel through multiple components on this fast
track development. DPC’s strategy to resolving challenging issues was seen
through implementing innovative change control procedures. By managing all
Consultants and Contractors on site, successful completion of RWS was seen in
less than 5 years for the 2 major work zones. The first zone, The Central Zone
(2008-2010), comprised the infrastructure, basement, four hotels, F&B,
retail outlets, attractions and the casino. Then from 2010 to 2012, the second
West Zone was completed comprising of additional basements, three hotel
components, spa, F&B, the Marine Life Park & Aquarium, the Water Theme
Park & Maritime Museum.
As the Lead
Consultant on the project, DPC was in charge of managing the overall process
from design coordination through to construction management. The practice of
adopting fresh approaches to management enabled DP Consultants to ensure
successful and timely procurement management for more than 100 NSC and
direct-works packages for both Central and West Zone main-contracts
respectively. This also involved scope interfacing, site operations
coordination, statutory compliance checks, clearances as well as management of
full contract administration processes with various consultants and Specialist
Teams.
Maritime
Experiential Museum
Category: Recreational & Civic Country: Singapore Year of Completion: 2011 Client: Resorts World Sentosa Pte Ltd
The Maritime
Experiential Museum (MEMA) component of the RWS works was given the privilege
to house the Jewel of Muscat, an Omani Dhow which was a gift from His Majesty
Sultan Qaboos of Oman to Singapore, forming part of the curatorial exhibits.
This life size Dhow was incorporated into the design after commencement of the
works, and when major superstructure were already underway. Work methods and
sequences had to be adjusted to cater for the logistics receiving operations,
such as landing and the internal manoeuvring of the Dhow, planning access
through the building envelope, major lifting operations to its installation
platform in the midst of on-going construction works.
The delivery
of the Dhow was closely monitored by DPC in line with the on-going construction
progress. Detailed studies and preparation works were planned in close liaison
with the assigned logistics movers for the transportation and movement of the
Dhow.
DPC also
facilitated ‘dry runs’ in advance of its actual arrival to simulate the lifting
and manoeuvring operations through very tight and limited access points /
openings into the building, through to the final location to ensure that there
was no room for failure, reversed works and damages to this precious gift.
World
Resort Sentosa " Multiple Hotels
Category: Master Plan & Urban
Design, Mixed-used Development, Recreational & Civic Country: Singapore Year of Completion: 2010, 2011 Client: Resorts World Sentosa Pte Ltd Size: 49ha (Overall Resorts World Sentosa)
Meticulous
Program Management was critical in the successful completion of Resort World
Sentosa’s (RWS) multiple hotels and hospitality components. DP Consultant’s
(DPC) Program Management services involved providing extensive knowledge and
experience in developing leisure destinations and resorts for the purpose of
strategically planning and guiding the project through a successful opening.
DPC
experienced perspectives assisted the Client in making timely and appropriate
business decisions affecting the credibility and economic viability of the
project. One of the many requirements was to achieve multiple Temporary
Occupation Permits (TOP) over a compressed timeline. DP Consultants led the
team through developing, implementing and controlling the stringent program to
reach phase completion and achieve progressive state of operations.
The
Fullerton Hotel
Category: Hospitality Country: Singapore Year of Completion: 2001 Client: Sino Land Co (HK) Ltd Size: 50,800sqm
The Fullerton
Hotel is a restoration and adaptive re-use project that required collaboration
among its design consultants.
As project
managers, a close working relationship with the architect was established to
ensure that the conservation guidelines were adhered to. Much of the exterior
of the building required conservation, while certain parts of the interior were
also retained and refurbished.
The
restoration of the building required strengthening of the existing structure of
the building. The project management team guided the structural engineers to
achieve this without compromising the design intent of the project.
The team was
also tasked to work closely with the interior designers to create a unique
experience for the hotel guests. The scope of work included the selection of
the furniture, layout of the guestrooms and public spaces, and commissioning of
art work.
© 2015 glknatalie |
Stats
78 Views
Added on May 20, 2015 Last Updated on May 20, 2015 Tags: DP Consulting Group Singapore PT, DP Consultants, DP Group of Companies, Projects AuthorglknatalieMoscow, RussiaAboutDPC provides comprehensive management services through all phases of a project from pre-development to post-construction. The group offers a wide range of professional services focusing on the success.. more..Writing
|